单项选择题
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
A.PowerVM Standard Edition
B.VMControl Standard Edition
C.Hardware Management Console
D.IBM Systems Director Standard Edition
相关考题
-
单项选择题
WhichofthefollowingisincludedinIBMSystemsDirectorExpressEdition?()
A.Energy management
B.Virtual image deployment
C.Virtual resource management
D.Networking device management -
单项选择题
WhileusingvirtualizationtoshareSANadaptersonaserver,howdoesNodePortIDVirtualization(NPIV)differfromVirtualSCSI(vSCSI)relatedtotheuseofmultipathingsoftware?()
A.NPIV and vSCSI both require multipathing in VIO Server only.
B.NPIV requires multipathing software on client LPARs, vSCSI requires multipathing software on VIO Server.
C.NPIV requires multipathing software on VIO Server, vSCSI requires multipathing software on client LPARs.
D.NPIV requires multipathing and MPIO software on VIO Server LPARs, vSCSI requires multipathing software on VIO Server and MPIO on client LPARs. -
单项选择题
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()
A.Create a system profile for each partition. Assign all needed resources as 'required'.
B.Define all system resources as 'desired' on the Testing partition. Activate only as needed.
C.Create two shared processor pools. Assign the minimal I/O resources required for each partition to the shared pools.
D.Create both partitions with minimal 'required' resources, and optional resources as 'desired'. Activate each partition as necessary.