单项选择题
A datacenter has exceeded the load on the central uninterruptible power supply (UPS) for the room and is causing power load problems. Additional power is available, but not using the central UPS.
Which of the following is the BEST temporary solution for adding new servers until an upgrade of the central UPS can occur?()
A. Continue plugging into the central UPS, but put the UPS on bypass to avoid load problems.
B. Plug the servers directly into the power that is not on the UPS.
C. Add stand alone UPSs for new servers not wired off the central UPS.
D. Continue plugging into the central UPS because the actual load supported is actually higher than stated
相关考题
-
单项选择题
WhichofthefollowingserversresolvescomputernamestoIPaddresses?()
A. Directory services
B. DNS
C. NTP
D. DHCP -
单项选择题
Whenaddinganotherservertoanexistingrackmountsystem,whichofthefollowingshouldthe administratorconsiderFIRST?()
A. Load on UPS
B. Rack temperature
C. Room temperature
D. Ease of access -
单项选择题
Which of the following is the BEST sequence to bare metal restore a server?()
A. Determine backups available, restore backups, and verify data.
B. Restore applications, restore data, and verify data.
C. Restore OS, restore system applications, and restore data.
D. Contact end users of outage, restore backup data, and verify data.