单项选择题
Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations.
Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()
A.IBMeConfig
B.IBM Performance Monitor
C.IBM Workload Estimator (WLE)
D.IBM System Planning Tool (SPT)
相关考题
-
单项选择题
A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirement?()
A.PowerHA SystemMirror Basic Edition
B.PowerHA SystemMirror Express Edition
C.PowerHA SystemMirror Standard Edition
D.PowerHA SystemMirror Enterprise Edition -
单项选择题
Ancustomerwithlimitedstoragemanagementskillsneedsadisksubsystemwithupto70TBcapacityand enterpriseclassperformance.Whichdiskstoragesystemshouldberecommended?()
A.DS6800
B.DS8100
C.DS8300
D.XIV Storage System -
单项选择题
AcustomerisimplementingaPOWERBladesolutionwhichrequirestheVIOServertobemirroredon internaldiskdrives.WhichBladesupportstherequirement?()
A.JS21
B.JS23
C.PS700
D.PS701
