欢迎来到在线考试题库网 在线考试题库官网
logo
全部科目 > IBM认证考试 > IBM(000-119)

单项选择题

In order to link data centers, a customer is evaluating the installation of fiber optic cable between buildings that are 400 meters apart. The installation will require multiple patch panels and cables.
Which of the following is the most critical factor to consider for this installation?()

    A. I/O rate
    B. bandwidth
    C. signal loss
    D. Dense Wavelength Division Multiplexing (DWDM)

点击查看答案

相关考题

微信小程序免费搜题
微信扫一扫,加关注免费搜题

微信扫一扫,加关注免费搜题