单项选择题
Every new crude oil tanker of 20000 tons deadweight and above and every new product carrier of 30000 tons deadweight and above shall be provided with().
A.segregated ballast tanks
B.moulded draught measurement system
C.additional ballast water system
D.dedicated clean ballast tanks system
相关考题
-
单项选择题
According to Annex V to MARPOL 73/78,garbage containing plastic is permitted to be disposed of by().
A.Incinerating offshore
B.Discharging when at least 12 nautical miles from nearest land
C.Grinding to less than 1 and discharging at least 12 nautical miles from nearest land
D.Grinding to less than 1 and discharging at least 25 nautical miles from nearest land -
单项选择题
A ship that,at any time,operates seaward of the outermost boundary of the territorial sea is required to prepare,submit,and maintain a(n)().
A.Synthetic plastic discharge plan
B.Oil discharge plan
C.Shipboard oil pollution emergency plan
D.Vapor recovery procedures plan -
单项选择题
()is not considered as anti-pollution equipment.
A.Oil discharge monitoring and control system
B.Oily-water separating equipment
C.Oil filtering system
D.Oil loading and discharge system
